This project focuses on enhancing water infrastructure on Masirah Island to ensure consistent and safe water delivery. The work includes:
- Rehabilitation and Maintenance of Distribution Network: Upgrading and repairing the existing water distribution network across the island to improve reliability and address any leakage or inefficiency.
- Construction of a Steel Elevated Tank: Building a durable, steel elevated tank to increase storage capacity and support the consistent distribution of water at optimal pressure to surrounding areas.
- Pipeline Installation and Maintenance: Installing new pipelines and maintaining existing ones to enhance the overall flow and reach of the water distribution system on the island.